Vis denne siden på norsk

Mobile crane Work Procedure



The crane operator will

The crane operator will not


Lineup

ASSESS SOIL CONDITIONS

Confirm that the ground is secure and pay attention to any obstructions. When in doubt, new risk assessments must be carried out, and if needed geotechnical investigations should be carried out.

USE SUBSTRATE PLATES

Substrate plates for outriggers should always be used. Substrate pads should be a minimum of 75 x 75 cm. If steel pads are used against steel pads, there must always be a layer of fiber-material in between. The plates for the outrigger substrate pads should be secured against slippage. The crane outrigger pads must stand as straight as possible. Remember that plastic pads are slippery against snow, preferably use sand or gravel beneath.

THE ANGLE OF THE CRANE

The crane should be straightened into a horizontal position in both directions. For crawler cranes without outriggers, the substrate must not have a greater angle of inclination than what is described in the instruction manual.

OUTRIGGERS

The outriggers should, where applicable, be driven from the undercarriage. The over carriage should never be turned until the outriggers are in place. Exception: When the program allows it.
Check that there is tension on all outriggers and that all wheels are lifted off the ground.


Before the lifting operation


During the lifting operation


After the lifting operation

After-use inspection: Check whether the lifting equipment and crane are still in proper condition.


Risky work operations


Hazardous elements